Trailing edge and about a 1/2 foor out needed to be planned down.
Same on the port side.
The templates were showing that the leading edge needed to be built out a bit so I used hardwood batten to build out the leading edge.
Glassed over the "new" leading edge.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment