Tuesday, April 22, 2008

Templating the Keel

Had to grind down the cracked glass located where the keel attaches to the fibreglass stub on both the starboard and port sides. They were minor cracks but I couldn't live with them.


Using the templates I have confirmed that this keel has not been templated with J/30 templates. The keel requires about 1/2 an inch (10MM) added to the leading edge. As you can see with the templates that creates a gap up into the maximum chord thickness.




The end of the keel about 1 foot from the trailing edge wasn't flat so it had to be planned down.
I only had to plane down the trailing end of the keel (using a power planer). The leading edge was left untouched as it will be built up using hardwood battens about 10MM wide and 5MM thick.
Same on the port side.










Hull Update - All that is left is the polishing

The Starboard and port sides have been wetsanded (800, 1200 1500 grit). The boat has been cut with a machine polisher.

In this picture the first quarter of the starboard bow has been machine polished with polishing compound.



Wednesday, April 9, 2008

Epoxy barriered holes for the deck hardware

All holes required to fasten down hardware was filled with epoxy before redrilling.

If leakage occurs in the future, the balsa core is not compromised and will stay dry. I predrilled the holes using variable speed with a 5/8" counter sink bit - then use a 5/8" inch forstner bit to drill the balsa out. Then filled the holes with epoxy thickened with collidical sillica, I used a 50 ML medical shringe to push the epoxy in. I used masking tape to seal off the inside so that the epoxy couldn't ooze out.



Hull Liner Primed and Painted

With the boat taped off with no ventilation I couldn't spray. I'll rolled awlgrip 545 primer and then rolled awlgrip properly prepared with flattening agent. Not as good as spraying but I can live with it.





95% of the hull is now faired